
Team Based Work.
This time team project takes more than 1 month, with other 3 people.
In addition, there were lots of works to do. We have to write the proposal, make PPT, make and do the survey, and write more than 20 pages paper. Our team's subject was "low birth rate of Singapore."
When beginning, I could endure the burden of work. However, when time past and I got some other 4 projects, the works looked out of my control. There were lots of works everyday, and it wasn't easy to find Singapore's information in English. If I were in Korea, I could better since I knew when to find the information.
On top of that, since I couldn't have many chances to write down or say something in English due to the Korean English Education system which just teach and test the listening and reading, I couldn't better. Although I tried best, my works seemed not enough for our teammates, they had to change a lot.
I was very angry about myself, and felt sorry for my team mates. My poor English makes my teammates change my work, and that leads me difficult to memorize my script in presentation since the final script was different with my first version.
Actually, since this team project needs "professional work", my team couldn't help but change my all works.
Through this long time team projects, I have learned lots of things such as team based work, English writing, and time organizing skill. Also, it taught me a lot to work together with people from other majors like engineering and math. It was very different from working with business major students.
I was lucky to work with good people! Thanks Cass, Miran, and Chi-cheng.
댓글 없음:
댓글 쓰기